Project: Wateree Effluent Pipeline (Design Build)
Owner: Palmetto Utilities, Inc.
Engineer: MBD Consulting Engineers
Description: Installation of 47,000 feet of 36” Ductile Iron Pipe and 12,175 feet of 42” Ductile Iron Pipe from Elgin WWTP to the Wateree River. Project included DOT Jack and Bores, Fittings, Valves, restoration and testing, also included a diffuser system installed into the Wateree River.
Cost: $13,775,258.78
Time: 270 Days
Completed: October 2017

