Project: Northern Pipeline (Design Build)
Owner: Palmetto Utilities, Inc
Engineer: MBD Consulting Engineers
Description: Installation of 111,486 feet of 24” Ductile Iron Force Main from Elgin WWTP to Blythwood SC Pump Station. Project included R/R bores, Directional Drills, DOT Jack and Bores, Fittings, Valves, restoration and testing.
Cost: $20,023,863.45
Time: 365 Days
Completed: October 2017